Installation Instructions
Mounting the Hood
CAUTION
At least two installers are required due to the
weight and size of the hood.
1. Measure from range top to hood bottom and
mark line A. (26" minimum from range top).
2. Plum and mark center line.
3. Mark mounting height line B. (12-1/4" from line
A).
4. Mark mounting spread from C/L on line B. From
C/L to left mount mark (3-1/2"). From C/L to
right mount mark (2").
5. Fasten (2) #6 x 1-1/2" screws into studs on line B
but do not tighten all the way.
WARNING
Wood blocking may need to be added behind
the drywall if no studs are present. Wall anchors
may also be used but check local codes for
compliance. Failure to use suitable wall anchors
and screws to hold the weight of the hood could
result in personal injury or damage to cooking
surface or counter.
6. Hang hood onto screws and hand tighten shown on C in FIG. B. Use the last 6# x 1-1/2" screws to
further secure the hood to the wall from inside the hood.
7. Center and attach duct cover bracket to wall below ceiling or soffit using (2) 6# x 1-1/2" screws.
8. Install electrical.
14
C/L
3-1/2"
B
A
C/L
FIG. B
Milano Use, Care, and Installation Guide
C O R E
M I L A N O
WA L L
Duct Cover Bracket
2"
12-1/4"
26" min
C