Mounting The Hood - Zephyr Roma Pro Guide D'utilisation, D'entretien Et D'installation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installation Instructions

Mounting the Hood

1. Measure from range top to hood bottom and
mark line A. (24" minimum from range top).
2. Plum and mark center line. Mark mounting
height line B (14-1/2" from line A). Mark
mounting height line C (4-7/8" from line A).
3. Mark mounting spread from C/L on line B and
C according to diagram.
4. Fasten (2) 6# x 2" screws into studs on line B.
Fasten (3) 6# x 2" screws into studs on line
C. Do not fasten screws all the way, leave
approximately 3/8" exposed.
NOTE: Wood blocking may need to be added
behind the drywall if no studs are present. Wall
anchors may also be used but check local
codes for compliance. Failure to use suitable
wall anchors and screws to hold the weight
of the hood could result in personal injury or
damage to cooking surface or counter.
5. Install round duct collar with backdraft damper
to top or rear of hood by (4) M4x8 screws.
6. Hang hood onto wall mounted screws and
tighten. (FIG. B1)
7. Center and attach duct cover bracket to wall
below ceiling or soffit using (2) 6# x 1-1/2"
screws.
8. Prepare and connect electrical and install duct work and duct tape.
9. Power up hood and check for leaks around duct tape.
10. Place telescopic duct covers onto hood and extend inner (top) duct cover upwards and secure to
duct cover bracket using (2) M4x8 screws.
14
B
C
4-7/8"
11-13/16" (36")
13-3/4" (48")
2
Roma Pro Use, Care, and Installation Guide
R O M A P R O
Duct Cover
Bracket
19-7/8"
14-1/2"
A
11-13/16" (36")
13-3/4" (48")
24" min.
C/L
1
FIG. B
P R O
WA L L

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Zrp-e36bsZrp-e48bs

Table des Matières