Télécharger Imprimer la page

Mitsubishi Electric CITY MULTI PURY-HP-TNU-A1 Manuel D'installation page 25

Publicité

Les langues disponibles

Les langues disponibles

<Refrigerant piping connection examples>
・Obtain joints and elbows on site as necessary according to the pipe diameter, and connect the pipes as shown in the figures below.
(1) When routing the pipes through the front of the unit
(2) When routing the pipes through the bottom of the unit
<A> High-pressure side
<B> Low-pressure side
Refrigerant service valve piping
Reducer etc.
Elbow
On-site piping
<Reference> Size of refrigerant pipes
High-pressure side
HP72
ø15.88 (ø5/8)
HP96
ø19.05 (ø3/4)
HP120
・When expanding the on-site piping, satisfy the minimum insertion depth requirement as follows.
Pipe size [mm (in)]
ø5 (ø1/4) or more, less than ø8 (ø3/8)
ø8 (ø3/8) or more, less than ø12 (ø1/2)
ø12 (ø1/2) or more, less than ø16 (ø11/16)
ø16 (ø11/16) or more, less than ø25 (ø1)
ø25 (ø1) or more, less than ø35 (ø1-7/16)
ø35 (ø1-7/16) or more, less than ø45 (ø1-13/16)
WT10508X02
<A>
<B>
<A>
<B>
On-site piping [mm (in)]
Low-pressure side
ø19.05 (ø3/4)
ø22.2 (ø7/8)
ø28.58 (ø1-1/8)
Service valve piping [mm (in)]
High-pressure side
ø22.2 (ø7/8)
ø28.58 (ø1-1/8)
Minimum insertion depth [mm (in)]
6 (1/4)
7 (5/16)
8 (3/8)
10 (7/16)
12 (1/2)
14 (9/16)
GB-23
Low-pressure side
ø28.58 (ø1-1/8)

Publicité

loading

Ce manuel est également adapté pour:

City multi pury-hp-ynu-a1