U
F
(
3)
PPER
INISH
MV
1
FASTENINGS
b
ax2
2
bx2
TOOL REQUIRED
PARTS
Ax2
SHELVES (
7)
MV
1
FASTENINGS
ax4
A
TOOL REQUIRED
PARTS
Ax2
12
GB
ASSEMBLY
A
1
Insert the dowels (a) into the front hole of the
upper finish (A), pushing them in until they stop
and keeping the pressure on until the upper finish
makes contact with the module underneath.
a
2
Once the finish is in place, secure it with
the securing plates (b), using a cross-shaped
screwdriver.
ASSEMBLY
1
Secure the shelves (A) using the 4 screws (a)
onto the side of a basic module, lining up the holes
on the shelving unit with those on the module.
a
V
1
FASTENINGS
bx2
ax2
A
TOOL REQUIRED
2
PARTS
B
A
b
B
H
ORIZONTAL
1
FASTENINGS
ax4
A
TOOL REQUIRED
2
PARTS
A
B
H
(
ERTICAL
OTTLE
OLDER
MV
ASSEMBLY
1
Secure the bottle holder (A) using the 2
screws (a) onto the side of a basic module at the
top, lining up the holes on the support with those
on the module.
a
2
Secure the shelves (B) using the 2 screws (b)
onto the side of a basic module at the bottom,
lining up the holes on the shelving unit with those
on the module.
B
H
(
OTTLE
OLDER
MV
ASSEMBLY
1
Position the horizontal bottle holder (A)
against a basic module and line up the 4 holes,
inserting the 4 linking screws (a) into all 4 of them.
a
Tighten from inside the basic module.
2
Place the bottle holder on the one below, and
secure it using the 4 linking screws and tighten
from inside the basic module.
4)
5)
13
GB