C
P
M
ORNER
EDESTAL
Take the size of the corner module into account before positioning the assembly.
FASTENINGS
ax8
1
TOOL REQUIRED
+ 2 foot supports for the 1st module (MV9)
2
PARTS
3
A
B
4
Cx2
5
6
7
6
GB
(
17)
ODULE
MV
Warning !
A
1st MODULE
1
Locate the foot supports (C) (4 for the
first pedestal module and just 2 for every other
abutting pedestal) in the grooves provided and
align the foot support holes with those in the
a
wooden pedestal (A). Tighten the 2 screws (a) in
each foot support diagonally inside the pedestal
C
and lock off.
a
B
2
Place the module on the floor and check the
height of pedestal using a spirit level.
B
3
Place the rack (B) in its housing.
ADDITIONAL MODULES
4
Place the module next to the previous one,
remembering that each corner module makes
a 45° curve. Position the foot supports of the
previous module in the grooves of the new
pedestal module.
5
Line up the holes and insert the 2 screws (a)
in the remaining free holes in each foot support.
6
Check the level of the assembly.
7
Place the rack (B) in its housing.
B
1
B
FASTENINGS
ax4
bx4
cx2
b
a
TOOL REQUIRED
A
2
PARTS
A
Bx2
3
Cx4
4
Dx4
C
ASSEMBLY
FASTENINGS
dx4
B
C
M
(
ASIC
ORNER
ODULE
MV
ASSEMBLY
1
Position the 4 dowels (b) in the sides (B).
Fit the rack (A) onto the 4 dowels (b).
Push the 4 screws (a) into the rack and screw
together the assembly.
ASSEMBLY
2
Position the 2 dowels (c) in the pedestal
module. Fit the two sides onto the pedestal
module.
c
3
When the 2 modules are back to back, you
will need to link them using 4 linking screws (d).
Push the linking screws into the holes provided
d
in the shelf support strips on the 2 contacting
panels. Tighten until the 2 panels are in contact
and correctly aligned.
BOTTLE STORAGE
4
Position the 4 rack supports (C) in the shelf
support strips and locate the rack (A). Position
the 2 bottle stops (D) at either end of the rack
(widest part).Then insert your first row of 4
bottles in the rack slots, followed by a series of
A
5 bottles.
D
16)
7
GB