9
Pop out the first wiring access slug. Use second if
New Construction
A11
5/8
1/2
Position the correct depth mark at the bottom edge of
the joist based on the thickness of your sheetrock.
41946-01 R111207
needed.
Choose Installation Option
For New Construction go to step A11, page 5
For Existing Construction go to step B11, page 8
E
11
E
Insert the strain relief (not included) into the housing
A12
5/8
1/2
Screw pre-loaded screws into joist or framing.
5
C
and
secure with washer.
B