08.5. Equipment assembly
You must always connect the equipment and all the elements involved in
the work process to a grounding connection to eliminate static electricity.
09. Start up
Before each start-up and especially after cleaning or repairing the unit, a check must be made that all
its elements are securely tightened.
The first time you use your equipment there is no need to depressurise it, as it is already supplied in a
totally depressurised state, though it will be necessary to do this each time any maintenance or repair
work is carried out.
Should this safety measure not be observed, this may lead to malfunctions, personal injury and
accidents, which may prove to be fatal. ELCOMETER Ltd. does not accept any responsibility for the
consequences of any non-compliance with these safety regulations.
Only if the whole process indicated in the section regarding
DEPRESSURISATION, described in section 10, has been correctly
carried out will the unit be ready to be started and used again.
The incorrect observance of this Depressurisation process could lead
to malfunctions in the equipment and deterioration of its components.
www.elcometer.com
EN
09