Télécharger Imprimer la page

PFB R10BF Notice D'utilisation Et D'entretien page 37

Publicité

GUIDE RAIL MOUNTED TENSION PULLEY:
Models with the horizontal counterweight mount the mounting support at
about 260mm (approximate value: Fig. 4) from the bottom of the shaft.
Models with the vertical counterweight mount the mounting support at
about 460mm (approximate value: Fig. 5) from the bottom of the shaft.
Support the counterweight of the models with horizontal counterweight until
it is in an oblique position (Fig. 4).
In the model with vertical counterweight keep a distance of about 100mm
between counterweight and bottom of the shaft (Fig. 5).
In the presence of a brake mechanism acting upwards, mount the
second rope-end to the rope-anchor of the brake device.
or:
Supply the second rope-end with the rope-anchor and attach it to the safety
gear.
Remove the support in order to stretch the rope.
If the assembly has been properly carried
out, the horizontal counterweight should take
a slightly upward angled position (fig. 4).
PIT MOUNTED PULLEY:
Mount the leading plate of the counterweight to achieve perfect alignment
between the pulley of the overspeed governor and the pulley of the tension
weight (Fig. 6).
Hold the counterweight, until it reaches a height of about 45 mm from the
bottom of the shaft (approx. value) (Fig. 6).
Fig. 4
Fig. 5
Fig. 6
R4/K
R4/R
R4/V
37

Publicité

loading

Ce manuel est également adapté pour:

R12bf