Télécharger Imprimer la page

Miele PDR 914 G Plan D'installation page 12

Sécheuse professionnelle, chauffage gaz

Publicité

Les langues disponibles

Les langues disponibles

en - Installation notes
Configuring the room ventilation opening
 Rooms in which rotary irons and tumble dryers are operated must have an induced
ventilation system (e.g., ventilation slots in windows and doors, wall openings with grilles,
or opened windows or skylights).
For example 1
A duct diameter of 6" (150 mm) was specified in example 1. According to this duct diame-
ter, a room ventilation opening with a size of 17' 5" (531 cm) is required. The edge length is
9 1/16" (230 mm) (see Table 3).
For example 2
A total duct diameter of 8 11/16" (220 mm) was specified. According to this duct diameter,
a room ventilation opening with a size of 37' 4" (1,140 cm) is required. The edge length is
14 13/16" (377 mm) (see Table 3).
For example 3
Since in this case the tumble dryer is connected to a central air supply, additional ventila-
tion openings are not needed.
Gas
Take these safety precautions if you smell gas
- Extinguish all flames immediately.
- Close the on-site gas shut-off device, the gas shut-off device on the gas meter or the
main gas shut-off device immediately.
- Open all windows and doors immediately.
- Do not light any naked flames (e.g., matches or lighters).
- Do not smoke.
- If there is the smell of gas in a room, never enter the room with an open flame.
- Do not carry out any actions that will create electrical sparks (such as pulling out electri-
cal plugs or pressing electrical switches or bells).
- If you cannot find the cause of the gas smell and all gas valves have been shut off, please
call the gas supply company immediately.
If other persons are being shown how to operate the machine, they must be given and/or
made aware of these important safety precautions.
During installation, the technical regulations for gas installations as well as national and
regional building regulations, fire regulations, and specifications from the relevant gas
supply companies must be adhered to.
When planning a gas-heated system, contact the relevant gas supply company and a
building regulations inspector.
12

Publicité

loading