Shed Assembly Floors and Walls
Push front floor (A) and rear floor (C) panels together
and secure with four screws (NN).
Note: Refer to pages 10 and 11 for information about
how to secure floors to foundation.
Tip left front corner (D) outward slightly and bend corner
hinge.
Align tab on bottom right side of left front corner (D) with
slot on front floor (A). Lower panel into slot and lock in
place by sliding panel toward door opening.
7
Note: Use a rubber mallet to "push" left front
corner (C) into locked position.
Tip left front corner (D) back to vertical position and
align lower tabs on right side with slots in floor.
Note: You will hear a snap when tab is fully engaged.
15