Installation Example; Accessories Construction - aqua Isipool Rx L3 Manuel D'installation Et D'entretien

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

H: Collar connected to the injection valve "g" before the input of the recycle of the swimming
pool.
I: Rx probe into the electrode holder "j" and collar "k" to be positioned in vertical position with
a tolerance of +/-45°
K: Collar for the electrode holder "j" positioned at the exit of the installation filter.
M: Electric box to drive the filtration plant
N: Filtration pump to suck the water from the swimming pool and send it into the filter "o".
O: Filter for the filtration of the water of the swimming pool.
P: Tank of the chemical to feed the peristaltic pump through the foot filter "f".
Q: Swimming pool representation.

2.6 Installation example.

2.7 Accessories construction

12/05/2010
15

Hide quick links:

Publicité

Table des Matières
loading

Table des Matières