-
AQUA S.P.A. -
.
VIA T
CROTTI
6
INSTALLATION
6.1
INDICATIONS
-
GB Installation, electrical connection and commissioning must be carried out by skilled
personnel in compliance with the general and local safety regulations in force. Failure to
comply with these instructions not only causes risk to personal safety and damage to the
equipment, but invalidates every right to assistance under guarantee.
-
The pumps may contain small quantities of residual water from testing. We advise
flushing them briefly with clean water before their final installation.
-
Respect the technical data shown on the data plate. Follow the wiring diagrams. The
mains voltage must be the same as that shown on the motor plate.
-
Make a good earth connection.
-
For three-phase motors check the correct direction of rotation of the motor which must be
clockwise. Otherwise invert any two phase leads, after having disconnected the
electropump from the power mains.
L0200440
1 42018 S
M
AN
ARTINO IN RIO
–
(RE)
WWW.AQUA.IT
ITALY
R
.1
03/03/16
EV
DEL
19