Télécharger Imprimer la page

Brandt BFCE 162 Mode D'emploi page 34

Sèche-linge à condenseur

Publicité

Les langues disponibles
  • FR

Les langues disponibles

Installation
dryer
waste water pipe). The necessary hose
The tumble dryer
can be ordered from the customer service
tion grille below the door of the tumble
(AS 1350).
Electrical connection
A Home Office socket is required for the
air.
electrical connection of the tumble dryer
and, if a permanent connection is to be
Alignment
The tumble dryer
must be placed on an
even and stable floor. Small irregularities
electrical connection must comply with
the national regulations and any addition-
four,adjustable feet. To do this, use a fiat
al regulations stipulated by the power
dryer
supply company. The fuse protection and
the type of machine is given on the rating
plate at the rear of the tumble dryer. The
dryer to be
before the electrical connection has been
built under a continuous working surface.
made.
The necessary cover plate (order no AP
1000) is available from the customer ser-
Using the tumble
time
ers.
When a tumble dryer is built under a work
dryer
surface, for reasons of safety, a cover plate
for the first time.
must be fitted by a qualified workman in-
Wherever possible tumble dry loads of
similar fabrics.
Washing machine/tumble dryer stack
on top of your washing machine. The
no.: MBS 1000).
Water removal
The moisture that is removed from the
laundry during the drying process is col-
voir. This must be emptied after each
drying programme.
densation water to be drained away di-
• Sort the laundry into loads according to
the type of fabric, the care label symbols
(see table) and the desired drying tem-
perature.
35
17.7
l..
g
tumble drying

Publicité

loading