DINAMIC 1.1
EN
Introduce the evaporator base on the studs
11
and secure with (4) flat washers, (4) Grower
washers and (4) M6 nuts.
VERY IMPORTANT
!
The wastewater run-off must be sufficient
to prevent water from dropping onto the
upholstery.
Connect recirculation probe and
12
communications wiring.
24
dirna
, s.a.
11
11
12