Télécharger Imprimer la page

peerless-AV SA761PU Installation Et Assemblage page 15

Masquer les pouces Voir aussi pour SA761PU:

Publicité

Les langues disponibles

Les langues disponibles

Cable Management
J
NOTE: Make sure cables have enough slack to
8
allow full movement of the arm.
K
Run power cable through top or bottom of arm (A)
and signal cable(s) through other side of arm in
order to avoid interference with the signal. Lock
cables into place by snapping cable covers (J &
K) onto mount as shown. Screen may have to be
moved for easy access.
Optional: If additional cable management is
required route cable ties (G) through slots of arm (A)
as shown in detail 3.
A
CABLE
SLOT
G
DETAIL 3
Snap wall plate covers (F) to top and bottom of wall
WALL PLATE RAIL
9
plate rails as shown.
F
15 of 66
ISSUED: 10-30-09 SHEET #: 095-9298-7 01-15-11

Publicité

loading

Ce manuel est également adapté pour:

Sa763pu