Rev.0 18/07/2019
Pag.58
EN
Connections
! IMPORTANT
! IMPORTANT
Connection with external air intake
The stove has been designed for hermetic installations.
To make the connection with an external air intake, proceed as follows:
step
action
Connect a 50 mm diameter pipe to the combustion air inlet pipe at the back of the stove. Note: the pipe must be no
1
more than 2 m in length.
The air vent must be installed in such a way that it can not be blocked.
Chimney connection
The chimney must be sized so as to guarantee the draught declared by the Manufacturer.
Electrical connection
The plug of the stove power cable must be connected only after installation and assembly has been completed
of the device, and must remain accessible after installation.
To perform the electrical connection, proceed as follows:
step
action
1
Connect the power cord to the back of the stove.
Schema elettrico KTR AIR
2
Connect the plug of the power cord to the wall socket.
Schema elettrico Scheda madre
Electric scheme
Scheda OPZIONALE
per gestione
domotica
G2
S3
G4
S2
verde
bianco
S1
G1
G5
Use and maintenance manual Luna
The connections must be set up by a technician that is qualified and/or authorised by the
Manufacturer.
If the power supply cable is damaged, it must be replaced by the manufacturer or
aftersales service, or, in any case, by a person with a similar qualification, in order to
prevent any risk. In case of replacement, the installer must use a cable with the following
cross-section: H05VV-F sez. 3x0,75x1200mm.
(configurazione ventilata o canalizzata singola)
NO
NC
COM
G6
Vers. 03 del 22/03/16
Connessione OPZIONALE per
gestione domotica
NC
NO
C
G5 G5
G6
G6
G6
10 9
8
7
6
5
4
3
2
1
RETE ALIMENTAZIONE 220 V
Fase
Neutro
R1
T1
T2
T3
T4
T5
LEGEND:
Safety devices
T1 - Pellet safety
T2 - Vacuum switch
Motors
M1 - Infeed screw gear motor
M2 - Room fan
M3 - Fume exhaust system
M4 - Heat exchanger 1 fan
M5 - Heat exchanger 2 fan
Resistance
R1 - 250watt heaterSonde
Probes
S1 - Fume probe
S2 - External thermostat
S3 - Room probe
S4 - Rear or RRight Probe/
EXT. T.
S5 - RLeft Probe/EXT T.
General
G2
G1 - Flow meter
G2 - Extractor revolution
reading encoder