Before Using The Pump - EUROM SPV550i-Prof Instructions De Service

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Description
SPV750is
SPV550i/SPV750i
1. Handle
2. Electrical cable including plug
3. Connection of the float switch
4. Bleeding valve
5. Float switch
6. Hose connection (SPV750is includes a synthetic bend)
7. Suction opening

Before Using the Pump

Check all the components of the pump. Determine that damage has not occurred
during transport or storage. A qualified electrician should carry out all the electrical
work activities in which all the national and local regulations should be observed.
Before using the pump, measure the insulation value between the earth wire and
each phase of the engine. This value should be more than 2 MΩ at a working
temperature. The socket (and any extension cord) must have an earth wire and a 30
mA earth leakage circuit breaker.
Hose Connection
The diameter of the hose should be equal to the drain of the pump: 2" / 50 mm.
17

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

260472Spv750i-prof260519Spv750is-prof260533

Table des Matières