•
Connect water inlet and outlet pipes.
•
Establish main power feed and alarm cable with customer's equipment. When units are provided without power and alarm
cables (or industrial connectors), cable on terminal blocks into the electrical box, according to the e-plan enclosed with the
unit.
•
CHILLER with pump: Purge pumps by loosening purging screw that is located on the side of pump. Be advised that the pump
has been purged correctly when only water is visible.
70040-167_01-__(EB2.0_Op._Manual_EN-DE-IT-ES-FR-RU).docx
English
Picture 12 – Pipe connection
Picture 13 – Electrical connections
16