Installation
1
Install and Anchor Unit
Rough-in of plumbing lines must be completed
before unit can be properly installed.
A
Remove Access panel and with
the help of another person, place
unit in position .
B
Ensure unit is level, shimming floor unit if
necessary . Using the base as a template,
mark the floor anchor locations .
Connect Water Supply
2
to Valve Assembly
WARNING! Do not turn on water until
Step 3 is completed!
Connect stops to hot and cold water supply .
A
Connect one end of each supply hose to a
stop and the other end to the hot and cold
inlets of the Navigator TMV .
Bradley • 215-1068 Rev. J; ECN 14-00-007
Water Supply
Gang Valve
Assembly
Red Tube (to Aerator)
Green Tube (to Aerator)
Black Tube (to Aerator)
Yellow Tube (to Aerator)
Red Tube (to Aerator)
Green Tube (to Aerator)
Black Tube (to Aerator)
Yellow Tube (to Aerator)
Navigator
TMV
Cold Supply Inlet
OPTIONAL TEMPERED LINE CONNECTION: Connect stop to
B
supply . Connect one end of the supply hose to the stop and the
other end to the tempered line adapter in the gang valve assembly .
SN2008/AST4, SN2008/AST4-F
15" (381) Dia .
Install a minimum of four 3/8" bolts (supplied
C
by installer) around unit at the marked
locations (eight is recommended) . Secure unit
to floor .
Braided
Hose
Stop Valve
8/18/2014
Water Supply
Gang Valve
Assembly
OPTIONAL
Tempered Line
Adapter Assembly
(S39-804)
Hot Supply Inlet
5