Télécharger Imprimer la page

Franke VISION ISLAND 36 Mode D'emploi Et D'entretien page 9

Publicité

Les langues disponibles

Les langues disponibles

INSTALLATION
• Use a plumb line to mark the center of the Cooking surface on the ceiling/support shelf.
• Place the drilling template 21 provided on the ceiling/support shelf, making sure that the
template is in the correct position by lining up the axes of the template with those of the hob.
• Mark the centers of the holes in the template.
• Drill the holes at the points marked:
• For concrete ceilings, drill for plugs appropriate to the screw size.
• For hollow brick ceilings with wall thickness of 13/16": drill ø 3/8" (immediately insert
the Dowels 11 if supplied).
• For wooden beam ceilings, drill according to the wood screws used.
• For wooden shelf, drill ø 1/4".
• For the power supply cable feed, drill ø 3/8".
• For the air outlet (Ducted Version), drill according to the diameter of the external air ex-
haust duct connection.
• Insert two screws of the following type, crossing them and leaving 3/16" from the ceiling:
• For concrete ceilings, use the appropriate plugs for the screw size (not provided).
• for Cavity ceiling with inner space, with wall thickness of approx. 13/16", Screws 12h,
supplied.
• For wooden beam ceilings, use 4 wood screws (not provided).
• For wooden shelf, use 4 screws 12g with washers 22 and nuts 23, provided.
EN
Drilling the Ceiling/shelf and fixing the frame
DRILLING THE CEILING/SHELF
9 9

Publicité

loading

Ce manuel est également adapté pour:

Fdf 364 i