Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

5.
Attach the connector to the clips on the arm.
6.
Tighten the screw (Torx 20) on the arm of the
reference station.
4.1 Introduction - maintenance
Make a check of the installation each year.
1.
Make sure that the post is tightly attached.
Screw
Reference station to arm
Arm to post
Arm, support bracket and post bracket

8 - Maintenance

T20
7.
Connect the low-voltage cable to the reference
station and the power supply.
8.
Attach the low-voltage cable to the wall from the
reference station to the power supply with cable
ties.
9.
Put the power supply at a minimum height of 30
cm / 12 in. from the ground. Refer to
where to put the power supply on page 5 .
10. Connect the power supply cable to a 100-240V
power outlet.
11. Wait until the LED status indicator is solid green.
First the LED status indicator is flashing green for
some minutes. Refer to
reference station on page 9 .
4 Maintenance
2.
Make a check of the tightening torques for all
screws.
Tool
Torx 20
Hex key, 4 mm
Hex key, 4 mm
CAUTION:
If the low-voltage
cable is not attached tightly with cable
ties it can be damaged in hard wind.
To examine
LED indicator lamp on the
Tightening torque (Nm)
1.8
5-6
5-6
1512 - 001 - 11.11.2020

Publicité

Table des Matières
loading

Table des Matières