Télécharger Imprimer la page

WIKA DSSA11SA Mode D'emploi page 16

Publicité

Les langues disponibles

Les langues disponibles

5. Commissioning, operation
5.5 Electrical mounting
The activities described in this chapter may only be carried out by skilled electrical
personnel.
EN
5.5.1
Requirements for voltage supply
This equipment is intended for operation with low voltages, which are separated from
the AC 230 V (50 Hz) mains voltage – or voltages greater than AC 50 V or DC 120 V for
dry environments. A connection to an SELV circuit is recommended, or alternatively to
circuits with a different protective measure in accordance with IEC 60364-4-41 installation
standard.
5.5.2
Requirements for electrical connection
Ingress protection of the mating connector corresponds to the ingress protection of the
instrument.
Cable diameter matches the cable bushing of the mating connector.
Cable gland and seals of the mating connector are correctly seated.
No moisture can ingress at the cable end.
5.5.3
Requirement for shield and grounding
The instrument must be grounded via the process connection.
When working during a running process operation, measures to prevent electrostatic
discharge on the connection terminals should be taken, as a discharge could lead to
temporary corruption of the measured value.
5.5.4
Connecting the instrument
1. Assemble the mating connector or cable outlet.
→ For pin assignment see product label
2
Establish the plug connection.
.
5.6 Teach function (if available)
With the teach function, the instrument can be configured by short-circuiting the teach pin
with U-.
Setting the switch point and the window
To adopt the prevailing process pressure as a new switch point or high value (window).
16
WIKA operating instructions, model DSSA11SA

Publicité

loading