INSTALLATION
4. The draft caused by the tendency for hot air to rise will
be increased with an interior chimney.
5.
requires regular inspection to ensure that it is not
obstructed thus blocking the draft, and it should be
cleaned when used regularly.
FACTORY BUILT CHIMNEY
When a metal prefabricated chimney is used, the
manufacturer's installation instructions must be followed.
and install the ceiling support package or wall pass-
proper clearance to the structure as recommended by the
manufacturer. The chimney must be the required height
above the roof or other obstructions for safety and proper
draft operation.
Listed
Chimney
Combustible
Ceiling Joists
Chimney
Connector
Listed Cap
Maintain 2"
Storm Collar
Clearance
Flashing
Listed
Chimney
Ceiling
Support
*
Chimney
Connector
To Stove
Floor
Protector
MASONRY CHIMNEY
Ensure that a masonry chimney meets the minimum
standards of the National Fire Protection Association
sure there are no cracks, loose mortar or other signs
of deterioration and blockage. Be sure to the chimney
cleaned before the stove is installed and operated. When
connecting the stove through a combustible wall to a
masonry chimney, special methods are needed.
Attic
Insulation
Sheild
Specified
Clearance
Ceiling
Support
To Stove
* Refer to Clearance
to Combustibles
Combustible Wall
Concrete Cap
1" Clearance
with Firestop
Rafter
Flashing
Combustible Wall
Thimble
12" of Brick
To Stove
Floor
Protector
COMBUSTIBLE WALL CHIMNEY CONNECTOR
PASS-THROUGHS
METHOD A -
liner, construct a wall pass-through. The clay liner must
wall combustibles. The clay liner shall run from the brick
masonry outer surface to the inner surface of the chimney
9
© 2023 United States Stove Company
Fireclay Flue
Liner With
Airspace
Flashing
Eave
1" Clearance
Sheathing
Airtight
Cleanout
Door