The fully disassembled AC connector is shown below:
AC terminal
Threaded sleeve
head
Fig. 27. AC connector.
According to the above table, select a suitable cable, re-
b.
move the insulation sleeve from the AC cable about 50 mm,
and remove the insulation from the end of the L/PE/N ca-
bles about 8 mm, as shown in Fig. 28:
St r ippe d le ng th: 8 mm.
50 mm.
Fig. 28. Cable stripping.
Insert the stripped end of the three cables into the cor-
c.
responding hole of the terminal head (yellow-green cable
into the PE port, phase into the L port and neutral into the
N port). Pull from the cable to check that it is properly con-
nected, as shown in Fig. 29:
Allen wrench
Fig. 29. Inserting the bare wire into the terminal.
According to the direction of the arrow, push the threaded
d.
sleeve until it connects to the AC terminal head, and then
turn the cable gland clockwise to lock it, as shown in Fig.
30:
Fig. 30. Connecting and fastening the sleeve on the AC
terminal.
Connect the AC connector to the inverter's AC terminal;
e.
a click indicates that the connection is in place, as shown
in Fig. 31:
USER MANUAL
Cable gland
Cable diameter: 10-14 mm.
Fig. 31. Connecting the AC connector to the inverter's AC
terminal.
Intersperse the relevant AC protections according to
f.
current regulations. The differentials must be type B.
Connect the other end of the hose to the AC circuit breaker
g.
in the junction box, downstream of the connection's IGA.
L
N
ID
IGA
GND
ID
Fus.
MCB
SPD
Fig. 32. Electrical wiring diagram.
For the connection of equipment with 24h monitoring, see
manual EL23300.
PIAs
Inverter
EQX2 SOLAR INVERTERS CONNECTED TO THE GRID
57