Télécharger Imprimer la page

Salicru EQUINOX EQX2 2001-S Mode D'emploi page 67

Masquer les pouces Voir aussi pour EQUINOX EQX2 2001-S:

Publicité

Les langues disponibles

Les langues disponibles

7.4.3.1. Electrical diagram of the installation.
Make sure that the installation is as shown on the diagram in
section 5.6.
7.4.3.2. Configuring the installation on the app.
The inverter must be powered through the solar field at all times throughout the entire process.
Click on the plant that has been created to access its details:
For the time being, only the power of the solar
field that has been entered will be displayed
because the measurement instruments are not yet
connected; this will be shown with the "Devices
offline" message on the top of the synoptic chart.
The ESM1 EQX network analyser is already
physically connected to the 485/WiFi 24H EQX
communication module, so it will only be necessary to
link the latter.
Add a  device to the plant that has been created: press the
"properties" button [ ], to the right of the plant title.
USER MANUAL
EQX2 SOLAR INVERTERS CONNECTED TO THE GRID
67

Publicité

loading

Ce manuel est également adapté pour:

Equinox eqx2 3001-sEquinox eqx2 3002-sEquinox eqx2 3002-sxEquinox eqx2 4002-sEquinox eqx2 4002-sxEquinox eqx2 5002-s ... Afficher tout