Télécharger Imprimer la page

Kohler K-7147 Guide D'installation page 8

Publicité

Lift Rod
Loop
Lift Rod
Assembly
6. Install Flush Hood
- Use pliers to spread the top loop of the lift rod apart. Insert the end
of the loop into the hole in the end of the overflow hood lever. Close
the lift rod loop with pliers.
- Insert the lift rod assembly, with attached hood, into the overflow
elbow.
- Install the hood by lifting it up and attaching the hood hinge to the
overflow elbow with the screws provided.
- Lift the hood to open the drain. The stopper should lift to
approximately 3/8" (1cm). If it does not, remove the lift rod
assembly.
- If the stopper does not lift high enough, use the adjusting screw to
adjust the spring downward. If the stopper lifts more than 3/8"
(1cm), adjust the spring upward.
7. Installation Checkout
- Ensure that all connections are tight.
- Open the drain.
- Turn on main water supply and check for leaks. Repair as needed.
A
1018154-2-
All manuals and user guides at all-guides.com
Hood
Assembly
8
Kohler Co.

Publicité

loading

Ce manuel est également adapté pour:

K-7149