Télécharger Imprimer la page

Thermolec DCC-11-PCB Serie Manuel D'installation page 8

Publicité

Les langues disponibles

Les langues disponibles

STEP 7 (OPTIONAL): CONNECTION TO A THIRD PARTY
ENERGY MANAGEMENT SYSTEM
If a third-party system is to control the DCC, see step 7 at the end of
this manual.
If the DCC is not used with a third party system, do not
remove the jumper connecting the two terminals of
the EMS IN input to create a closed contact.
STEP 8: START-UP
DCC power supply
1. Supply electrical power to the DCC.
2. Wait ten (10) seconds.
3. Check if the relay is switched on.
4. Check the pilot light:
GREEN at all time: compliant installation, go to the next step.
RED: refer to the Lights code section.
Charging station power supply
1. Put the circuit breaker in the ON position.
2. Check if the electric vehicle supply equipment (EVSE) is powered:
EVSE powered: go to the next step.
EVSE not energized: check the charging station connections.
STEP 9: SECURE AND RE-ENERGIZE
Secure
1. Turn off the power on the DCC.
2. Put the cover back.
Re-energize
1. Supply electrical power to the DCC.
STEP 10: IDENTIFICATION
1. Register all the information of the charging station owner
(address and parking space) in the space provided on the cover.
2. Register all configuration settings of the main power supply
(essential load) in the space provided on the cover.
3. Register all configuration settings of the charging station in the space
provided on the cover.
8

Publicité

loading

Ce manuel est également adapté pour:

Dcc-11-pcb-30aDcc-11-pcb-40aDcc-11-pcb-50aDcc-11-pcb-60a