Télécharger Imprimer la page

Thermolec DCC-11-PCB Serie Manuel D'installation page 5

Publicité

Les langues disponibles

Les langues disponibles

SPECIFICATIONS
The DCC – Electric Vehicle Energy Management System (EVEMS) is a
safety device with programmable controller that protects an electrical
distribution circuit in relation to its main breaker. It will prevent overloading
the electrical distribution circuit by momentarily turning off the power to
MODELS
BREAKER
the charging station when the demand exceeds 80% of the main breaker
EV charger
rating. DCC-11-PCB is the electronic infrastructure that fits inside the
DCC-11-PCB-30A
30A
DCC-11-BOX to complete a fully working DCC-11 unit.
DCC-11-PCB-40A
40A
DCC-11-PCB-50A
50A
DCC-11-PCB-60A
60A
Frequency
Operation temperature
Max torque
Total weight
*
*Approximative and can change without notice
CHARACTERISTICS
CONDITIONS FOR APPLICATION
The DCC-11 is an Energy Management System specially designed to
allow the connection of an EV Charger to be connected to a power source
without affecting load calculation.
INSTALLATIONS TYPES
Group installation, Wall installation, Ceiling installation
MAIN POWER SUPPLY (CB)
The DCC – Electric Vehicle Energy Management System can be powered
by a 240/208V AC single phase source.
MAIN POWER SUPPLY
60A
70A
80A
90A 100A 125A 150A
50 to 60 Hz
-22°F to 113°F (-30°C to 45°C)
Relay terminals: 40 in-lbf
Breaker terminals: 45 in-lbf
6 lb (2,72 kg)
.
The following options are offered by each DCC model:
MODELS
DCC-11-PCB-30A
200A
DCC-11-PCB-40A
DCC-11-PCB-50A
DCC-11-PCB-60A
Frequency
SECONDARY LOAD SUPPLY (EVC)
Operation temperature
The DCC-11-PCB – EVEMS will provide power to a charging station
Max torque
through an included 30A, 40A, 50A or 60A 240/208V AC circuit breaker,
L1, L2 and ground.
Total weight
*
*Approximative and can change without notice
TRIP PERCENTAGE (TP)
V5
The DCC - EVEMS is factory set to turn off the charging station if the total
consumption of a service exceeds 80%. For a different configuration, see
the "TP" configuration details on page 9 of this manual.
POWER OUTAGE
In the event of a power outage, the DCC – EVEMS automatically res-
tores the power supply to the vehicle charging station when power
returns
RECOVERY TIME (RT)
Following a power cut to the electric vehicle supply equipment (EVSE),
a 15 minutes delay is initiated to monitor the total consumption of the
electrical power system. Power to the vehicle will then be restored if the
total load consumption is lower than 80% of the main circuit breaker
rating during a period exceeding the 15 minutes' recovery time.
BREAKER
MAIN POWER SUPPLY
EV charger
60A
70A
80A
90A 100A 125A 150A
30A
40A
SEE
DCC-9
50A
60A
50 to 60 Hz
-22°F to 113°F (-30°C to 45°C)
Relay terminals: 40 in-lbf
Breaker terminals: 45 in-lbf
6 lb (2,72 kg)
.
5
200A
V5

Publicité

loading

Ce manuel est également adapté pour:

Dcc-11-pcb-30aDcc-11-pcb-40aDcc-11-pcb-50aDcc-11-pcb-60a