Télécharger Imprimer la page

EIBENSTOCK EBM 300/3 P Manuel D'instructions page 62

Publicité

Les langues disponibles
  • FR

Les langues disponibles

After each readjustment always check that the screws are tightly
fixed so that safe operating of the drill rig is possible.
Mounting the turnstile
Mount the turnstile (1) on
the right or left side of the
carriage (2) depending on
the work to be performed.
Check whether the turnstile
(1) is fixed tightly.
Fastening of the Drill Rig
Fastening on the floor by means of vacuum
Don't use the vacuum mounting on the wall and overhead!
For a low-pressure mounting the surface where the base is mounted must be
not porous and must be flat and free of cracks.
If this is not the case, this kind of mounting can't be used. For the vacuum
mounting you need a vacuum pump and a vacuum hoses (see illustration).
These items are available on request.
Connect the drill rig an the vacuum pump by means of a vacuum hose.
Get the drill rig in the correct position and switch on the pump.
Make sure, that all four levelling crews in the foot plate are turned back and
that a low pressure of -0,8 bar is reached.
By means of pressing the valve button in the handle the drill stand can be
unburdened (vacuum is escaping) and can be readjusted.
The vacuum pump must run during the whole working time and must
be placed so that one can see the manometer.
Make sure that the drill stand is fixed firmly before you start drilling!
All manuals and user guides at all-guides.com
Use
14
1
2
Klick

Publicité

loading