6
Assembling the exterior switch cabinet
6.1
Selecting the location
The location must be cool and protected from direct sunlight during the summer months. The rear side of
the round column/the sides of the cabinet must be installed with at least 10 cm clearance from the nearest
wall. If shading is provided for on-site, this must be located on the rear side or on the sides, leaving open
space so that the column/cabinet is sufficiently ventilated and in order to avoid trapped heat.
The base of the cabinet should be above the highest potential water level in the tank to prevent
wastewater overflowing into the cabinet.
The machine cabinet requires a separately protected electrical connection (16 amp, slow blow).
Additional electrical fixtures on the same fuse may disrupt operation.
The system generates noise! When operating, the air compressor generates continuous noise.
The air hoses must be no longer than 20 metres.
6.2
Electrical connection
The electrical connection of the switch cabinet must only be carried out by a
qualified electrician!
An underground cable must be laid to the cabinet for the power supply. This cable
must be protected by a 16 amp fuse via the building installation and must be
Fuse
able to be disconnected from the mains.
connections
6 Assembling the exterior switch cabinet
30 / 112