Télécharger Imprimer la page

Pentair INTELLIBRITE ARCHITECTURAL Serie Guide D'installation Et D'utilisation page 8

Publicité

Les langues disponibles

Les langues disponibles

4
Junction Box Installation Requirements for
Canadian Installs
Junction/Deck boxes must be installed:
(a) above the maximum water level of the pool/spa
(b) so that the top of the box is located at or above the level of the pool/spa deck
(c) in a manner and/or location where the box will not be an obstacle
(d) in such a manner that any water on the deck will drain away from the box
(e) sealed to the conduit to prevent water entering the box
Deck water drains
away from Junction/Deck Box
Approved Junction/Deck Box
Top of Junction Box flush
with Deck
INTELLIBRITE
Architectural Series Pool/Spa Light Installation and User's Guide
®
Water level
below Junction/Deck Box
FIGURE 3 (Canadian Installs)
Approved Junction/Deck Box
elevated and protected
Junction Box elevated above
Deck and protected
Diving Board or
other equipment
to protect
Junction/Deck Box

Publicité

loading