4. Install the 2
motor into the sides of the blower bracket using the 2 screws supplied (9f) in the
nd
position C.
c
5. Plug the 9 way connector on the second blower in position F.
f
6. Connect the damper (10.1) to the motors.
Install the 10" duct transition (6) and install with four screws (9c).
10.1
Detail of the second blower.
6
9c
9