g
General
To comply with the Canadian Electrical Code and the Canadian
Standards Association, the load center must be installed in accordance
with the information included on the label on the inside of the
equipment. A qualified electrical contractor or licensed electrician
must also do this in accordance with the applicable local electrical
codes and.
WARNING: Hazard of electrical shock or burn. Turn off power
supplying this equipment before working inside.
Installation
1 – Remove Front
Slip the front and accessory package back into the carton to protect
the finish.
2 – Remove Service Entrance Barrier (Main
Breaker only)
Back out and save the two mounting screws securing the service
entrance barrier over the main breaker connections, then lift the
barrier up and out.
Barrier
Mounting
Screws
DEH41005
Installation Instructions
PowerMark Gold ™ Load Centers
100–225 Ampere Single-Phase 12–42 Circuit, Indoor
Type
3 – Remove Interior (optional)
Back out mounting
screws and save for
reuse.
Slide interior up to
clear tabs and
remove.
4 – Mount Box
Flush mount: Line up the front box edge with
the finish wall surface and screw or nail to the
stud through the small knockouts in the box
side.
Surface mount: Screw or nail through the
keyhole slots in the back of the box.
Top or bottom feed
The load center will easily accommodate incoming electrical
service from the top or bottom. Rotate the entire load center
enclosure if a bottom feed configuration is required.
Nail or
Screw