Télécharger Imprimer la page

Mitsubishi Electric MVZ-A12 AA4 Manuel D'installation page 12

Masquer les pouces Voir aussi pour MVZ-A12 AA4:

Publicité

Les langues disponibles

Les langues disponibles

Completed Step. 14b View
Horizontal Left Coil Assembly
RUBBER
PLUGS
Step.14c Remove the rubber plugs indicated in the image above.
DETAIL A
2 PLASTIC TIES
PER SIDE
Step.14d Next, install the clear plastic tubes which are included
in the accessory bag. Ensure the plastic tubes drain into the pan.
Also, be sure the clear plastic tubes do not have any restriction.
Cutting of the plastic tube is required, please refer to the table for
length. Finally, secure the clear plastic tubes to the top drain pan
per Detail A. Then to the metal brackets supporting the coil to the
top drain pan with the provided plastic ties as shown.
12
PLASTIC TIE
PLASTIC TUBE
Model
MVZ-A12, 18, 24
MVZ-A30, 36
Step.15 Reinstall the coil assembly along with bracket(s) that
secure(s) it. Failure to reinstall the brackets will result in capacity
loss and condensation formation inside the cabinet. The wiring
harness for the thermistor connector will also reroute into the
electrical section and plug into CN44. Refer to 9.3. Step 1 to 4
in reverse order to reassemble the panels. Ensure the proper
knockouts are removed for drainage and electrical connections.
NOTE: For Horizontal installation an auxiliary drain pan must be
installed.
2 PLASTIC TUBES
ENSURE TUBES
DRAIN INTO
DRAIN PAN
CORRECT
5/8"
(15mm)
DETAIL A
Tube Length
4.9 in. (125 mm)
6.9 in. (175 mm)
SIDE DRAIN PAN
REATTACH
ON BOTTOM
BRACKETS
PRIMARY DRAIN
3/4" FPT
Horizontal Left
Fan assembly rotation required
INCORRECT
PLASTIC TIE
PLASTIC TUBE
MOTOR
ON BOTTOM
AIRFLOW
Auxiliary
drain pan

Publicité

loading

Ce manuel est également adapté pour:

M serieMvz- a18 aa4Mvz-a24 aa4Mvz-a30 aa4Mvz-a36 aa4