Bleeding Of Product And Water Pipe; Basic Procedure - Ecolab DG1-III-DLA-PCB Manuel D'utilisation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Starting up
7.2

Bleeding of product and water pipe

Venting of the product and water line is done by setting DIP switch elements 7 and 8
(DIP switch S1) and by pressing the start button

Basic procedure

1.
Set DIP7 or DIP8 to 1
ð Front LED flashes green
(different speed, depending on whether solenoid valve or DLA is switched)
2.
Press Start
ð Corresponding process starts.
3.
The stop (pause) button
Process step
Bleed water pipe
(Switch solenoid valve)
Bleed product line
(Switch pump)
MAN049250 Rev. 1-01.2021
Key:
stops the process.
DIP
Front LED
Ready for venting (solenoid valve closed)
0.3 s
LED:
DIP7 = 1
green
DIP8 = 0
Start button
0.5 s
LED: green
Ready for venting (pump stopped)
0.1 s
0.1 s
0.1 s
LED:
LED:
LED:
gree
DIP7 = 0
off
green
n
DIP8 = 1
Start button
0.5 s
LED: green
32
.
0.1 s
0.3 s
0.1 s
LED:
LED:
LED:
off
green
off
pressed / solenoid valve open / venting active
0.5 s
LED: off
0.1 s
0.1 s
0.1 s
LED:
LED:
LED:
off
green
off
pressed / pump running / venting active
0.5 s
LED: off
0,3 s...
LED:
green
0.5 s
LED: green
0.1 s
0.1 s
0.1 s
LED:
LED:
LED:
green
off
green
0.5 s
LED: green

Publicité

Table des Matières
loading

Produits Connexes pour Ecolab DG1-III-DLA-PCB

Table des Matières