Preparing To Start The Pump - Shallow Well; Winterizing The Pump - Pentair STA-RITE FSLCH-L Notice D'utilisation

Pompe à éjecteur transformables pour puits profonds
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Preparing to Start the Pump – Shallow Well
Figure 15: Open Control Valve
Priming
Open control valve
as far as possible
To do so can boil water inside pump, causing hazardous pressure in unit,
and fill pump and
risk of explosion and possibly scalding persons handling pump.
piping through
priming port
or priming tee.
water may cause pump to overheat, damaging seal and possibly causing
burns to persons handling pump. Fill pump with water before starting.
1. Open the control valve as far as possible (see Figure 15). Then remove
the priming plug from the pump and fill the pump, fill all piping
between the pump and the well, and make sure that all piping in
the well is full. If you have also installed a priming tee in the suction
piping, remove the plug from the tee and fill the suction piping.
2. Replace all fill plugs. Leave the control valve open (in a shallow well
installation, the control valve always stays open).
3. Power on! Start the pump. The pump should pump water in two or
three minutes.
284 0395
4. If you don't have water after 2 or 3 minutes, stop the pump and remove
the fill plugs. Refill the pump and piping. You may have to repeat this
two or three times in order to get all the trapped air out of the piping.
The control valve remains open throughout this procedure.
5. After the pump has built up pressure in the system and shut off, check
the pressure switch operation by opening a faucet or two and running
enough water out to bleed off pressure until the pump starts. The pump
should start when pressure drops to 30 PSI and stop when pressure
reaches 50 PSI. Run the pump through one or two complete cycles to
verify correct operation. This will also help clean the system of dirt and
scale dislodged during installation.
6.
(PL Series pumps only). Check for leaks around band clamp. If pump is
leaking, tighten clamp nut 1-2 turns. Do not overtighten.

Winterizing the Pump

To prepare the pump for freezing temperatures:
1. Shut off power to the pump.
2. Relieve system pressure. Open a faucet and let it drain until water
stops flowing.
3. Drain the pump. Your pump may have a separate drain plug. Remove
this plug and let it drain.
Your pump may only have a plug or connection on the side of the
pump. Remove this and let the pump drain. Some water will remain in
the pump. A small amount of water left in the pump will not harm it if
it freezes.
Explosion hazard. Never run pump against closed discharge.
Risk of burns. Never run pump dry. Running pump without
9

Publicité

Table des Matières
loading

Table des Matières