table of contents
EN
1.0
general information
1.1
rates and efficiencies
1.2
installation checklist
1.3
installation overview
1.4
rating plate information
1.5
mobile home installation
1.6
hardware list
1.7
optional heat management
system
2.0
dimensions
2.1
CBL36-1
2.2
CBL46
3.0
venting requirements
3.1
typical venting installation
3.2
minimum air terminal location
clearances
3.3
vent application flow chart
3.4
definitions
3.5
elbow vent length values
3.6
horizontal termination
3.7
vertical termination
3.8
vent shield installation (CBL46
only)
4.0
rough framing
4.1
minimum framing dimensions 25
5.0
venting installation
5.1
horizontal installation
5.2
vertical installation
5.3
using either flexible or rigid vent
components
5.4
using flexible vent
components
5.4.1 horizontal air terminal
installation
5.4.2 vertical air terminal installation 31
5.4.3 appliance vent connection
5.5
using rigid vent components 32
5.5.1 horizontal air terminal
installation
5.5.2 vertical air terminal installation 33
5.5.3 restricting vertical vents
5.6
vertical through existing
chimney
note:
Changes, other than editorial, are denoted by a vertical line in the margin
4
W415-3089 / B / 05.11.22
5
6.0
electrical information
5
6.1
hard wiring connection
6
6.2
receptacle wiring diagram
7
6.3
electronic wiring diagram
9
6.4
optional wall switch
9
6.5
battery back-up installation 37
10
6.6
wiring diagram
7.0
gas installation
8.0
nailing tab installation
11
12
9.0
operation
10.0
finish framing
12
13
10.1 flush
14
10.2 recessed
15
10.3 minimum clearance to
combustible enclosures
17
10.4 alcove enclosure
11.0
finishing
18
18
11.1 control cover installation
18
11.2 installing non-combustible
19
board
21
11.3 minimum combustible mantel
clearances
23
11.4 clearances around appliance
24
(TV and valuable objects)
11.5 safety screen & glass door
27
installation / removal
28
11.6 glass media installation
29
11.7 optional blower installation
11.8 restricting vertical vents
30
11.9 venturi adjustment
11.10 check pressure readings
30
11.11 flame characteristics
12.0
maintenance
30
12.1 care of glass
12.2 annual maintenance
31
12.3 glass / door replacement
13.0
replacement parts
13.1 CBL36-1 overview
32
13.2 CBL36-1 valve train
assembly
34
13.3 CBL46 overview
13.4 CBL46 valve train assembly 59
14.0
troubleshooting
35
15.0
warranty
36
36
36
36
36
38
39
39
40
41
41
42
43
43
44
44
45
46
47
48
49
50
51
51
52
52
53
53
54
54
55
56
57
58
60
63