Télécharger Imprimer la page

Stahl 8570/21 Serie Mode D'emploi page 24

Publicité

Les langues disponibles

Les langues disponibles

Commissioning
US
8
Commissioning
US
US
US
US
US
US
US
US
US
US
US
US
Before commissioning, do the following:
US
• Check the mounting and installation.
US
• Device must not be damaged.
US
• Remove any foreign bodies.
• If necessary, clean the connection chamber.
US
• Check if the conductors have been inserted correctly.
US
• Check whether all screws and nuts have been tightened firmly.
US
• Check whether all the cable entries and stopping plugs have been tightened firmly.
• Check whether all conductors have been clamped firmly.
US
• Observe the line voltage.
US
• Seal the unused cable entries with plugs certified according to
US
Directive 2014/34/EU or ANSI/UL and unused drilled holes with stopping plugs
US
certified according to Directive 2014/34/EU or ANSI/UL.
US
US
9
Operation
Only Type 8570/22 plugs from R. STAHL may be used.
24
SolConeX Receptacle, 20 A
Series 8570/21
Explosion hazard due to incorrect installation!
Non-compliance results in severe or fatal injuries.
• Check the device for proper installation before commissioning.
• Comply with national regulations.
Damage or destruction of the device by arc and high pressure is
possible if improper switching operations are used!
Non-compliance can result in severe or fatal injuries.
• Quickly switch the device on and off completely.
• Avoid switching positions between 0 and I (ON and OFF).
The receptacle may only be operated when fully mounted.
The receptacle can be switched only with the plug inserted.
If the plug has been disconnected, close the hinged cover with the
bayonet ring.
DANGER
WARNING
287620 / 8570674300
2022‐03‐28·IO00·III·en·00

Publicité

loading