Installation / Connection - Elster RGV Mode D'emploi

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 50

7. Installation / Connection

Warning! Never clean the plastic hood of the counter with
a dry cloth owing to the risk of explosion resulting from
electrostatic discharge! Please only ever use an adequately
moistened cloth!
Before installation please ensure:
that the protective caps and/or plastic sheeting is or are removed,
that the meter and accessories have been inspected for transport damage,
that the pistons rotate easily in the measuring chamber (e.g. by blowing on them),
that the accessories have been checked for completeness (e.g. plug connectors, oil for
initial filling).
You will require the following items for installation:
Type RVG and Type RVG-ST with flange:
Suitable seals/gaskets for the relevant gases.
For installing the meter in the pipe, use 8.8 screws in
accordance with DIN 931. The screw length must be
selected so that a thread reach of C mm (Table 2) into the
meter is guaranteed (Figure 3). The maximum tightening
torque is 110 Nm.
Screw size
DN
PN 10/16
25
M12
32
M16
40
M16
50
M16
80
M16
100
M16
150
M20
Table 2: Flange screws
10
Screws per meter
ANSI 150
PN 10/16
M12
8
M12
8
M12
8
M16
8
M16
16
M16
16
M20
16
© Elster GmbH · All rights reserved · Subject to technical modification
Elster-Instromet
Thread reach
ANSI 150
PN 10/16
8
14 – 20
8
16 – 22
8
16 – 22
8
16 – 22
8
16 – 22
16
16 – 22
16
20 – 28
Figure 3
C mm
ANSI 150
14 – 20
14 – 20
14 – 20
16 – 22
16 – 22
16 – 22
20 – 28

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Rgv-st

Table des Matières