INSTALLATION SPECIFICATIONS

1-phase
3,7 - 7,4 kW
3-phase***
11 - 22 kW
RCD 1-phase
RCD 3-phase
Power cable above ground
Power cable underground
Cable attachment
Combining with a smart meter (DSMR4.0)
Ethernet cable connection
* Always wire for the maximum hardware amperage under continuous load. Cable diameters are an indication,
NewMotion advises to always use one size bigger. The electrician is responsible for selecting a cable thickness




appropriate
for
your
specific
situation.

** The charge point can be set between 10 A and 32 A. The electrician must select an MCB to match the amperage
setting of the charge point.
*** The 3-phase charge point can also be connected to 1-phase. In that case the charge point can only charge on 1-phase.
INSTALLATION INSTRUCTION – ENGLISH – P8
Wiring*
< 50 m
50 – 100 m
3 x 6 mm
3 x 10 mm
2
5 x 6 mm
5 x 10 mm
2
30mA Type B, or 30mA Type A in combination with appropriate equip-
ment that guarantees power shutdown at DC leakage of more than 6mA.
30mA Type B, or 30mA Type A in combination with appropriate equip-
ment that guarantees power shutdown at DC leakage of more than 6mA.
YMvK
YMvK-As
At least PVC tube with clamping brackets and saddles
UTP cable with RJ11 connector
Standard CAT5 or CAT6 Ethernet cable (UTP cable with RJ45 connector)
Setting
MCB**
16 A
20 A type B
2
20 A
25 A type B
32 A
40 A type B
16 A
20 A type B
2
20 A
25 A type B
32 A
40 A type B