6. INSTALLATION
6.1
SUPPORT
Support pad:
1. The pad must be:
a. separate from any structure.
b. properly sized according to the size of the
cabinet. No portion of the cabinet shall
overhang beyond the pad (Fig. 6).
2. The pad must be level (Fig. 7). The pad location
must comply with National, State, and Local codes.
6.2
UNIT PLACEMENT
IMPORTANT
!
BEFORE INSTALLATION, REMOVE THE SHIPPING
3. Remove screws holding four brackets to the pallet
and lift off the clips (Fig. 8).
4. Center, position and place the unit onto pad (Fig. 9).
!
BRACKETS.
6
2" min
7
8
9
W415-2973 / B / 07.18.22
7
IOM