GB
Assembly Instructions
1.
Remove the T3 from its carryall
2.
Allow the ribs to drop outwards,
and position so that the central
causing the central boss to rise
boss is visible lying down
up towards you.
between the ribs.
4
All manuals and user guides at all-guides.com
3.
Lift the dome into position and
snap each joint together.
4.
To close each joint simply push inwards until it
locks shut.
IMPORTANT: The joints will snap together
with minimal pressure. If undue resistance is
felt then STOP and check none of the ribs are
twisted. Work your way around the dome
until all four main ribs are assembled.
5.
Assemble the porch rib by lifting and snapping
the joint together. Close the middle joint first, fol-
lowed by the two outer joints. Attach the elastic
loop over the central rib and insert onto spigot as
shown.
GB
5