Télécharger Imprimer la page
Honeywell TRADELINE HE220A Instructions D'installation
Honeywell TRADELINE HE220A Instructions D'installation

Honeywell TRADELINE HE220A Instructions D'installation

Humidificateurs à circulation directe et à dérivation
Masquer les pouces Voir aussi pour TRADELINE HE220A:

Publicité

Les langues disponibles

Les langues disponibles

Liens rapides

APPLICATION
The HE220A,B Bypass Flow-Through Humidifier uses the warm air
furnace blower to provide humidification for the whole house. The
HE220A,B works with virtually any Honeywell humidity control, but for
optimal performance, use with the Honeywell Perfect Climate Comfort
Center™ control.
INSTALLATION
WARNING
Hazardous Voltage.
Can cause personal injury or equipment damage.
Do not cut or drill into any air conditioning or electrical
accessory.
CAUTION
Freezing Water and High Water or Static Pressure Hazard.
Can cause water damage or permanent equipment damage.
• The humidifier must be located where the ambient
temperature is above 32°F (0°C) and below 160°F (71°C).
• Be sure supply plenum static pressure is no greater than
0.3 in. w.c. and water pressure is no greater than 125 psi.
IMPORTANT
To assure optimal product performance, be sure the template
is level before marking.
1. Determine the best location for the humidifier and draw a level line
on the plenum. See Fig. 1.
IMPORTANT
Mount the humidifier at least 3 in. (76 mm) above the furnace
jacket to allow adequate space for the solenoid valve and drain
line. Check that there is adequate space above the humidifier
to remove and install the humidifier cover. Do not install on a
furnace jacket.
® U.S. Registered Trademark
Copyright © 1998 Honeywell Inc. • All Rights Reserved
All manuals and user guides at all-guides.com
Bypass Flow-Through Humidifier
READ AND SAVE THESE INSTRUCTIONS
TEMPLATE
2. Tape the template in position and trace around the template.
3. Remove the template and carefully cut the rectangular opening.
4. Disassemble the humidifier. Remove the cover and take out the
humidifier pad assembly. See Fig. 2.
O N
R I Z
H O
O Y
W B
L O
Fig. 1. Typical humidifier installation locations.
NOTE: Sidewalls are interchangeable for either left or right
bypass installation. To change direction, remove the
screws holding each sidewall, switch sidewall locations
and reinstall the screws.
5. Position the humidifier housing in the opening (be sure it is level),
so the locking tabs are in place on the lower sheet metal edge of
the opening.
6. Secure the humidifier housing to the opening at the top and
bottom using sheet metal screws.
HE220A,B
INSTALLATION INSTRUCTIONS
L
T A
O Y
H B
H I G
W N
D O
O
F L
M12248B
69-1105EF-3

Publicité

loading

Sommaire des Matières pour Honeywell TRADELINE HE220A

  • Page 1 The HE220A,B Bypass Flow-Through Humidifier uses the warm air humidifier pad assembly. See Fig. 2. furnace blower to provide humidification for the whole house. The HE220A,B works with virtually any Honeywell humidity control, but for optimal performance, use with the Honeywell Perfect Climate Comfort Center™ control.
  • Page 2 All manuals and user guides at all-guides.com 7. Locate the other plenum and cut an opening for a 6 in. (152 mm) WIRING collar. 8. Install the 6 in. (152 mm) collar. CAUTION NOTE: Be sure to install a duct damper for summer shutoff on Hazardous Voltage.
  • Page 3 3. Connect a 1/2 in. drain tube to the humidifier drain fitting and run to a suitable drain. Home and Building Control Home and Building Control Honeywell Inc. Honeywell Limited-Honeywell Limitée 155 Gordon Baker Road Honeywell Plaza North York, Ontario P.O. Box 524...
  • Page 4 Honeywell, les humidificateurs HE220A,B offrent un remettre le couvercle. Ne pas installer l’humidificateur sur le rendement maximal lorsqu’ils sont utilisés avec le thermostat Honeywell boîtier de l’appareil de chauffage. Climate Comfort Center 2.
  • Page 5 All manuals and user guides at all-guides.com REMARQUE : Les parois latérales sont interchangeables; elles 10. Sceller les raccords de la gaine avec du ruban à gaine isolant. conviennent donc aux installations avec dérivation à droite ou à gauche. Pour inverser les REMARQUE : Si la gaine mesure plus de 120 cm (4 pi) de parois, enlever les vis qui les retiennent, les...
  • Page 6 à étrier à l’orifice d’entrée de l’électrovanne. Installer l’écrou à compression sur le tuyau en cuivre. Glisser la bague en cuivre sur le tuyau. Groupe de la Régulation Résidentielle et Commerciale Honeywell Limitée Honeywell Inc. 155 Gordon Baker Road Honeywell Plaza North York, Ontario P.O.

Ce manuel est également adapté pour:

Tradeline he220b