For handheld engine : The Emissions
Compliance Period referred to on the Emissions
Compliance label indicates the number of operating hours for which the engine has been shown to
meet Federal emission requirements.
Category C=50 hours, B=125 hours, and A=300 hours.
FEDERAL EMISSION COMPONENT DEFECT WARRANTY
EMISSION COMPONENT DEFECT WARRANTY COVERAGE - This emission warranty is applicable in all
States, except the State of California
Makita U.S.A., Inc., La Mirada, California, (herein "MAKITA") warrant to the initial retail purchaser and each
subsequent owner, that this utility equipment engine (herein "engine" ) was designed, built, and equipped
to conform at the time of initial sale to all applicable regulations of the U.S. Environmental Protection
Agency (EPA), and that the engine is free of defects in materials and workmanship which would cause this
engine to fail to conform with EPA regulations during its warranty period.
For the components listed under PARTS COVERED, Makita Factory Service Center or service center
authorized by MAKITA will, at no cost to you, make the necessary diagnosis, repair, or replacement necessary
to ensure that the engine complies with applicable U.S. EPA regulations.
EMISSION COMPONENT DEFECT WARRANTY PERIOD
The warranty period for this engine begins on the date of sale to the initial purchaser and continues for a
period of 2 years.
PARTS COVERED
Listed below are the parts covered by the Emission Component Defect Warranty. Some of the parts listed
below may require scheduled maintenance and are warranted up to the first scheduled replacement point
for that part.
1) Fuel Metering System
(i)
Carburetor and internal parts
(ii) Fuel filter, if applicable
(iii) Throttle stopper, if applicable
(iv) Choke System, if applicable
2) Air Induction System
(i)
Air cleaner plate
(ii) Air cleaner case
(iii) Air cleaner element
3) Ignition System
(i)
Spark plug
(ii) Flywheel Magneto
(iii) Ignition Coil
4) Miscellaneous Items Used in Above Systems
(i)
Fuel hoses. clamps and sealing gaskets
All manuals and user guides at all-guides.com
EMISSON COMPLIANCE PERIOD
18