Tap tower installation
1. Remove all packing tape from the Tap Tower.
2. Guide the Tap Tower Washer up the tap tower
hose and let it sit on the top of the cabinet. Then
feed the tap tower hose through the hole in the
top of the cabinet.
3. Align the notches at the bottom of the tower with
the hole in the top of the cabinet, then insert and
twist the tower clockwise to lock it into place
(about a 1/4turn).
Attaching coupler to tap tower
Remove the packing spring and Backflow Stopper
from inside the Keg Coupler, then reinsert the
Backflow Stopper into the Keg Coupler (rounded
side down).
Remove the black packing cap from the top of the
Coupler, then place the Top Coupler Washer flush
and centred on the top of the Keg Coupler.
After the Tap Tower has been placed on top the
cabinet and the hose line feeds through the bottom,
attach the wing nut to the Keg Coupler.
11
Tap Tower
Tap Tower Washer
Remove & discard
Insert (rounded
side down)