3. Commissioning
Commissioning of the system should only by
handled by a qualified professional.
Before commissioning the system:
- Rinse and clean all inlet pipes
- Rinse and clean the Aqualift F storage tank
- Check all connections for leaks
- Check all instructions / requirements in the
control unit's user's manual
- Fill the Aqualift F tank with water and check for
proper operation of the pressure switch
- Follow Point 4 of this manual
After connecting the control unit the system is
ready for commissioning.
3. Commissioning
26