Kessel Aqualift F Compact Directives Pour La Pose, Le Service Et La Maintenance page 24

Masquer les pouces Voir aussi pour Aqualift F Compact:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 33
2.1.4 Ventilation pipe
A dedicated ventilation pipe must be connected
to the Aqualift F. This ventilation pipe should be
open to the ambient air in order to equalize any
pressure which may build up in the system. The
size of the ventilation pipe shall be at least DN 70.
To prevent any odour nuisances from the ventila-
tion pipe – it should be run to outside ambient air
(outdoors). Connect the ventilation pipe as seen
in Illustration 3.
To drill out the ventilation hole use the KES-
SEL core hole drill attachment (Article Number
50101). The hole should be carefully drilled and
with precision
2.2 Installing / removing the pump(s)
The pump is held in place with the three locking
levers as seen in illustration 4. The pump's
pressure outlet is locked in place with a closure
clasp (illustration 4). After connecting the cable
and the air pressure hose to the control unit (see
installation and operation manual of the control
unit) the system is ready to be commissioned.
2. Installation
1
2
e
ill. 3
e
a = securing nut
1
b = base washer
c = Noise reduction gasket
d = threaded rod
e = anti-vibration matt
f = dowel
24
1
2
3
4
5
a
b
c
d
f
f
3
4
5
ill. 4
6
7
a
b
c
d
e
f
Alle Maße gelten für das Fertigteil einschliesslich O
All dimensions apply to the finished product includ
protection
Prüfmaß/
> <
Bezugsmaß/
Test dim.
Ref. dim
6
7
ill. 5

Publicité

Table des Matières
loading

Table des Matières