4.
Installation
4.1
Electrical connection RGB
Fig. 3: Strain relief
1
1.
Insert cables and snap shut clips until they lock
2.
Press down clip screws
3.
Tighten clip screw with screwdriver
4.
Lever open the snap-mechanism with a screwdriver to open the cable clips
Fig. 4: Wiring diagram
Room device RGB
Route connecting lines from RGB to boiler.
Here, the lines have to be fixed into the strain relief of the swit-
ching panel and to be connected according to the wiring diagram.
2
3
Wiring diagram
Installation
4
GB
33