R" signifies that the supposed phase L1 is the actual
phase L1 and the supposed phase L2 is the actu-
al phase L2
==> right rotary field
L# signifies that the supposed phase L1 is the actual
phase L2 and the supposed phase L2 is the actu-
al phase L1
==> left rotary field.
When re-testing with exchanged test probes the
opposite symbol has to be illuminated.
4.7 Measurement Point Illumination
Voltage testers 2000 are equipped with a measurement
point illumination feature. Thus, working under bad
lighting conditions (e.g. division switch cabinets) is
made easier.
" Press button for measurement point illumination
(10) on instrument rear.
5.0 Maintenance
When using UNITEST 2000 testers in compliance with
the instruction manual, no particular maintenance is re-
quired. If functional errors occur during normal operat-
ing, our service department will check your instrument
without delay.
Carrying out Measurements
L2
L3
L1
N
PE
touch
L2
L3
L1
N
PE
touch
R"
#L
21