Maintenance Instructions; Daily Checks; General Service - Speedaire 53RG60 Manuel D'utilisation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

MaINtENaNCE INStRUCtIONS

Maintenance operations should be held only when the system is shut
down and fully depressurized.
Do not modify or change the control settings.
Use only approved Alpha-Pure replacement parts.
Always check connections against leakage.
Ensure all loose parts are removed and secured to the dryer before
operation.

Daily Checks

Functional and visual checks are to be done daily. Ensure the green power-
on LED is illuminated.
Check any external damages.
If the service LED (red LED) appears, contact local distributor for
service.
Remove the dust and dirt from the dryer. Clean all surfaces which are
contaminated.

General Service

A full product service is recommended every 2 years or 12,000 hours of
operation (whichever occurs first). Desiccant to be replaced. Valves and
silencers are to be checked and replaced if necessary.
14
Maintenance operations should only be carried out
by authorized personnel.

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

53rg71

Table des Matières